TG Escapes Blog

Have you considered spreading your modular school build over multiple stages? Take a look at this three phase project at Woolwich Polytechnic.

by Karl Stokes | May 23, 2017 | Blog, Education

Woolwich Polytechnic Is a school that has been on the up for some years now. Situated in one of London’s less gentrified locations, it has long enjoyed a good reputation for the quality of its pastoral care and, in more recent times, the impact of clever, compassionate teaching has manifested itself in exam results which have been improving dramatically. In 2010 the school was named as the most improved boy’s school in England and, shortly after reforming its (co-ed) sixth form in 2011, it was judged by OFSTED to be outstanding. It is no surprise then that pupil numbers have been rising, as has the need for additional classroom space.

Working to a tight budget, the school nonetheless wanted an inspirational building in which to locate its Art department and the new post 16 provision. It needed to create significantly more space, quite rapidly, but also wanted to find a way to create an outdoor building that was flexible, sustainable and different. Staff did not, however, want to build something bland or temporary; they wanted their new block to be innovative and unique to their school. TG Escapes were delighted to be chosen as the provider of their space.

Initially, there were only sufficient funds to create an Art block, but the school was confident that further funding would become available in the future. Working closely with the school, our architect drew up plans that allowed for a phased building project, incorporating the prospect of a bigger, self-fulfilling vision of what might become. The students were actively involved in the process, and the TG Escapes team invited them to showcase their ideas: the best of which were incorporated into the final design.

600 place eco-classroom at Woolwich Polytechnic Secondary School by TG Escapes (21).jpg

Phase one began in 2012 with the demolition and removal of a small fleet of long term portacabins and the preparation of the site. In 2013, the school opened its new art block with space to teach over 200 students. In the first half of 2015, we built the new sixth form centre which comprised both classrooms and much needed additional office space. Phase two was rapidly followed by the third and final part of the project.

600 place eco-classroom at Woolwich Polytechnic Secondary School by TG Escapes (8).jpg

The two-storey building, our largest to date, provides 1600 square metres of floor space. It accommodates up to 600 students and staff and includes toilet facilities and a lift, not to mention a covered outdoor area and a beautiful, naturally lit art gallery. The entire project cost a little over £2m.

“Now this building has almost become almost the centrepiece of the school.”

600 place eco-classroom at Woolwich Polytechnic Secondary School by TG Escapes (4).jpg

600 place eco-classroom at Woolwich Polytechnic Secondary School by TG Escapes (27).jpg

600 place eco-classroom at Woolwich Polytechnic Secondary School by TG Escapes (5).jpg

600 place eco-classroom at Woolwich Polytechnic Secondary School by TG Escapes (29).jpg

About the author

Karl Stokes
Karl is Managing Director at TG Escapes. He has worked in the construction industry for over 20 years working closely with architects, clients, compliance and build teams.

More posts from our blog

How Modular Buildings Speed up School Construction

Summer holidays are upon us, the perfect time to complete vital work around your school without disrupting education. We've put together this look through the many ways that opting for a modular solution can save time, with a greatly reduced on-site installation...

read more
Could Biophilic Modular Buildings Benefit Autistic People?

Could Biophilic Modular Buildings Benefit Autistic People?

TG Escapes is proud to be exhibiting at the 2024 Autism Show in London from the 14th to the 15th of June. We’ll be able to talk you through the many amazing projects we’ve worked on for autistic pupils and broader SEND needs. We’re also thrilled to see several...

read more

The Challenges Facing SEND Schools Across the UK

This year's National Conference will be a crucial place for SEND leaders to discuss some of the major issues facing specialist education across the UK. TG Escapes will be in attendance, with our team available to discuss the amazing work we’ve...

read more