Brune Park Community School is part of the Gosport and Fareham MAT. Replacing an old SCOLA building they selected TG Escapes to design a net-zero modular timber frame building providing flexible classroom space and conferencing facilities to act as a business hub. The building includes nine classrooms which can be opened up, breakout and office spaces, and large atrium.
Read Case Study
Ashley is a large primary school for children aged between 4 and 11. Since September 2021, they have had three classes in each year group, with 630 pupils in the school. They benefit from a huge site which includes a large playing field and a forest school area, where children experience outdoor learning such as gardening, bee-keeping and scientific study.
The trust approached TG Escapes to design a modular school building for wrap-around care and to use as an art studio.
Read Case Study
Ratcliffe College have a growing roll putting pressure on their existing space. They decided to commission a new build to sit towards the front of the school and act as a showpiece at the entrance. The new block would accommodate the whole English department, one of the largest in the school, providing more suitable accommodation than before.
Read Case Study
Education Estates® is the annual gathering of the education community in partnership with the Department for Education and 2022 was its 10th anniversary. TG Escapes introduced a new single-entry nursery and primary concept school to accommodate 300 children aged 0-11 for a building cost of £4m at the time of design.
Read Case Study