Funding your building

Lease your building, preserve your capital

Every TG Escapes building can be leased, so you can spread the cost, avoid a large upfront outlay and still get the space your people need. Built for schools, trusts and local authorities working within tight budgets.

4.9 / 5  ·  200+ verified reviews
The challenge

Capital budgets are tight. The need for space is not.

Across the public sector, demand for new and better facilities keeps rising while capital budgets stay under pressure. Traditional construction can take two to three years to deliver, and large upfront costs put quality projects out of reach.

In education the pressure is sharpest in SEND provision. With a steep rise in Education, Health and Care Plans and pupils needing social, emotional and mental health support, many trusts and local authorities pay for expensive out-of-area placements simply because they have no room to expand.

Leasing offers a way through. It lets you create high-quality, lasting capacity now and pay for it in predictable instalments rather than one large capital sum.

How it works

A straightforward route to new space

No upfront capital

Spread the cost over the term of the lease instead of finding a large capital sum on day one.

IFRS16 compliant

Procured under the IFRS16 Maintained Schools Secretary of State Finance Lease Class Consent 2024, aligned with DfE expectations for value for money.

A funding partner alongside you

We work with an established public sector funding partner, so the process is familiar and well supported.

You keep the asset

The building is yours to use for its 50-year design life, giving you a lasting asset on your estate.

Invest to save

Build local capacity, cut recurring costs

For SEND the financial case is stark. A recent Kent County Council study found out-of-area placements can cost up to Β£142,000 per pupil each year once staffing and transport are included. Building your own provision turns that recurring spend into a long-term asset on your estate.

Running costs stay low too. Our buildings are carbon neutral for regulated energy as standard, with air source heat pumps and solar PV included, so more of your budget goes to students rather than energy bills.

Β£142k Typical out-of-area SEND placement, per pupil each year
0 yr Building design life you retain
Carbon neutral For regulated energy, as standard
What you can lease

Any TG Escapes building, available on lease

Classrooms and teaching blocks

High-quality classroom space to expand capacity quickly.

Early years and nurseries

Bright, biophilic spaces designed for the youngest learners.

Inclusive Learning Hubs for SEND

Pre-designed specialist provision for SEMH and additional needs. Our flagship leasing concept, detailed below.

Offices and commercial

Workspaces that are quick to deliver and low to run.

Sport and leisure

Pavilions and multi-use buildings for active school and community life.

Bespoke designs

Anything we build can be leased, designed around your site and your needs.

Biophilic Modular Timber Frame Classroom by TG Escapes
Worked example

The Inclusive Learning Hub

Developed with leading SEND architects Haverstock and The Blue Iris Partnership, our Inclusive Learning Hubs are purpose-built inclusion bases for mainstream or specialist settings, not retrofitted classrooms.

Each hub includes dedicated therapy rooms, sensory spaces, hygiene rooms and de-escalation zones, with direct access from classrooms to secure outdoor regulation areas. Biophilic design uses natural materials and daylight to lower stress and support better behaviour, attendance and outcomes.

They are designed to meet DfE Building Bulletin requirements and are fully compliant for local authority commissioning.

Inclusive Learning Hub

Models and indicative costs

Available in three models. Capital costs are indicative and exclude VAT and site-specific groundworks.

Model Capital cost Per place from Onsite delivery
16 place ~Β£1.45m Β£90.6k ~24 weeks
32 place ~Β£2.3m Β£72.3k ~30 weeks
64 place ~Β£4.2m Β£65.6k ~50 weeks

The buildings are carbon neutral for regulated energy, with air source heat pumps and solar PV included as standard.

Leasing illustration

Illustrative leasing costs over a 10-year term

Indicative figures, excluding VAT. Your funding partner will confirm exact terms.

Capacity Design and build Annual cost per student from
16 place Β£1.4m Β£11,175
32 place Β£2.4m Β£10,090
64 place Β£4.2m Β£8,831

Procured under the IFRS16 Maintained Schools Secretary of State Finance Lease Class Consent 2024. You retain the building for its 50-year design life.

Planning and delivery

Designed to move quickly

  1. Pre-planning packs

    Ready-prepared planning packs help accelerate the process and reduce the wait for approval.

  2. Permitted development

    Where site parameters allow, designs are tailored to align with permitted development rights for a faster route.

  3. Built off site

    Modern methods of construction mean your building is manufactured off site while groundworks happen in parallel.

  4. Installed in weeks

    A 16-place hub takes around 24 weeks on site, a 32-place around 30, and a 64-place around 50. Months, not years.

Next steps

Find out what leasing could do for your estate

Identify a site with high demand and we will provide a complimentary design and viability consultation, with an illustration of how leasing could work for your budget.