Why TG Escapes

Delivered on programme, priced with certainty

When your building has to be ready on a fixed date and land on a fixed budget, you need more than a promise.

4.9 / 5  ·  200+ verified reviews
Biophilic Modular Timber Frame Classroom by TG Escapes

The pressures you are working with

You are working to a date that will not move. Perhaps it is the start of an academic year, a funding round with a hard completion deadline, or a business decision that depends on the new space being open and in use. Whatever drives it, the building needs to be ready when you say it will be, and the pupils, staff or team need somewhere excellent to be in the meantime.

You are also accountable for the money. The figure you take to your head teacher, your governors, your board or your finance team is a figure you will be held to. If the cost drifts once work is under way, you are the one who has to explain it. So you need two things to be true at once: the programme has to be reliable, and the price you agree at the start has to be the price you pay at the end.

Those are reasonable things to want, and they are the things we design our whole way of working around.

Modular buildings

How we deliver on time

The short version: we make much of your building in our workshop while our teams prepare the ground on your site, and one team handles the lot. That parallel working, plus a single point of contact, is what keeps your programme predictable and on track.

Here is how it works in practice. Every project starts with a free design consultation and site survey, and our in-house architects turn your requirements into a bespoke design. Because that design and structural engineering happen under one roof, there is no waiting while separate firms hand drawings back and forth. We handle the planning application ourselves, taking on the principal designer and principal contractor duties, so the people who will actually build it manage the approvals stage.

Once you have signed off the design, two things happen at the same time. In our Coventry workshop, we manufacture your building as insulated timber frame panels in controlled conditions, to ISO 9001 and ISO 14001 standards, unaffected by weather, and checked as they are made. On your site, our own teams get on with the groundworks and foundations. Because these run in parallel rather than one after the other, the calendar compresses. The National Audit Office notes that modular construction can roughly halve on-site build time, and that is the mechanism behind it.

When the panels arrive, our installation teams assemble them, then complete the fit-out: electrics, water and power connections, plastering, painting and finishing, through to a building that is ready to use on handover. Keeping every stage in-house, from design to installation, means the on-site phase is shorter and quieter, with far less noise, dust and disruption, which is why our teams can work in a live school environment year-round rather than only during the holidays.

We deliberately do not headline a fixed number of weeks, because an honest timeline depends on seeing your site. Programme genuinely depends on the size and complexity of the building. What we will do is give you a realistic timeline for your specific project, and then manage the work so it stays on track, with controlled deliveries planned around your timetable.

How we deliver cost certainty

Cost certainty comes from two commitments: a fixed price, and a scope that leaves nothing to fall through the cracks.

After the free design stage, we give you a fixed upfront price. This is a firm commitment, not an estimate. It covers the whole turnkey scope, from planning and design through foundations, manufacture, installation, service connections and finishing, to handover. Because you are dealing with one company and one price, everything sits within a single, coordinated scope, with no gaps between separate trades. The figure you plan around is the figure you pay.

That single-team model is where a lot of the value sits. When one team owns design, manufacture and install, everything stays joined up from start to finish, which keeps both the programme and the price steady. Modular construction is also cost-effective compared with traditional construction, helped by controlled workshop conditions that reduce waste and rework. We will not quote you a percentage saving, because honest figures depend entirely on your building and site, but we will give you a clear, complete number you can rely on.

Your design is adjustable to budget. If the first concept comes in above where you need it, our architects will work with you to refine the specification and layout until the design and the price meet, rather than sending you away to start again.

On funding, we work with several routes and can help you make the case:

  • Capital budgets, where you are funding the project directly.
  • The Condition Improvement Fund (CIF) for eligible academies and schools, where we provide free architectural designs to strengthen your bid. CIF projects run from Β£20,000 for primary and special schools, or Β£50,000 for secondary and all-through schools and sixth-form colleges, up to a maximum of Β£4,000,000, and must complete within the round’s deadline.
  • Section 106 developer contributions for community and education buildings, including support for Biodiversity Net Gain.
  • Lease funding, for schools and trusts that would rather spread the cost. This route runs over a 10-year term with no upfront capital investment, under the IFRS 16 Maintained Schools Secretary of State Finance Lease Class Consent 2024. Our buildings are designed for roughly a further 40 years of life beyond the lease, in line with their 50-year-plus design life. The route also comes with a complimentary, no-obligation design and viability consultation.

You can explore the numbers in more detail on our financing and leasing page.

0+ Buildings delivered UK-wide
0+ Education buildings
0+ Years, building since 2003
4.9/5 Feefo rating, 200+ reviews

What our clients say

Fantastic from start to finish. The team listened to our requirements and provided a solution that met our needs. We were involved in progress meetings and kept informed as the work progressed. Project completed within deadlines and within budget.

Tina Denham School Bursar
Multi-use Eco Building at Thackley Primary School View the project

The quality is outstanding, as is the speed of construction. The TG Escapes buildings we've had have been right first time and snag free give or take. We get a good quality product that is delivered on time and absolutely meets the needs of our delivery programme.

David Webb Principal Project Manager, Capital Projects, Surrey County Council
SEND Hub for the Visually Impaired at Woking High School View the project

TG Escapes took a project that was unaffordable as a traditional build and through bespoke modular design and construction delivered an affordable outstanding building on time and in-budget. An impressive feat, particularly during a global pandemic and Brexit.

Adrian Maxey Director of Estates & Facilities
Work Skills and Enterprise Centre at St Joseph’s Specialist Trust View the project
Questions & answers

Common questions

Get started

Let's talk about your programme and budget

Every project starts with a free, no-obligation design consultation, so you can see exactly what your building will be and what it will cost before you commit.